September 1, 2020
Uncategorized
Master Scheduling: The Rough-Cut Capacity Planning (RCCP)
To be sure that the published master schedule is realistic and achievable a high-level capacity feasibility study is performed, called rough-cut capacity planning. This course is designed for master schedulers, and manufacturing planners and provides the basic insights as to the RCCP concepts with an example of the calculations.