My Courses  |    |  Register  |  Cart  |  Log In

Master Scheduling: The Rough-Cut Capacity Planning (RCCP)

Current Status
Not Enrolled
Price
29.95

To be sure that the published master schedule is realistic and achievable a high-level capacity feasibility study is performed, called rough-cut capacity planning. This course is designed for master schedulers, and manufacturing planners and provides the basic insights as to the RCCP concepts with an example of the calculations.